STABLE PARTITIONS
At T.A.G. Creations we offer a range of internal partitions, so you can create your dream stables in your own barn/indoor space.
We offer three different ranges, the Economy Range, the Mid Range and the Premium Range so there is something to suit all budgets.
We never scrimp on quality so even with our starter Economy range, you can be guaranteed strong, hardwearing and durable stables built to the highest of standards that will last you for years to come.
As standard, the framework for our stables are built from a minimum of 50mm x 50mm mild steel box section, 3mm in thickness to ensure strength and stability. This is then either coated in a protective paint (Economy Range) or hot-dip galvanised (Mid & Premium Ranges) to preserve it.
The partitions are available in two sizes, 10' wide or 12' wide, giving you the option of creating 10'x'10' stables, 12'x12' stables, or mix and match for 10'x12' stables. All front partitions come with a 4' wide doorway, which include a bolt at the top of the door and a 'kick-over' bolt at the bottom as standard.
We start with the basic partitions, which are clad along the bottom panel, with an open top panel. You can then choose from the optional extras, such as top panel cladding, top panel bars etc. so you design your perfect stable block.
Our top panel cladding is made from the same material as our bottom panel cladding (depending on your chosen price range) so you can be guaranteed the same excellent quality. Our top panel bars are made from 21mm round mild steel tube and are placed 100mm apart,making them more lightweight than solid bars, yet still maintaining their strength and practicality.
THE RANGES
Economy Range
• 3mm thick, 50mm x 50mm mild steel box section framework, painted for protection
• 18mm thick OSB wooden panel walls (11mm thick on top panels), coated with a protective lacquer to preserve their
lifespan
Mid Range
• 3mm thick, 50mm x 50mm mild steel box section framework, hot-dip galvanised after fabrication for maximum
protection
• 25mm thick pressure-treated wooden tongue and groove walls
Premium Range
• 3mm thick, 50mm x 50mm mild steel box section framework, hot-dip galvanised after fabrication for maximum
protection
• A choice of : -
- 40mm thick pressure-treated wooden tongue and groove walls
(extra thick wooden boards for extra strength and durability)
OR
- ??mm thick 'wood-effect' composite plastic tongue and groove walls
(composite plastic is extremely strong with the added benefit of being more rot-resistant than it's wooden
equivalent)
These images show the Economy Range, featuring the OSB panels.
(Please note, these are example drawings of our designs, not actual photos and are for illustrative purposes only)
All our partitions come as complete panels, which then bolt together, meaning we can deliver them just about anywhere in Mainland UK on a pallet via our couriers. They are all sent out with clear instructions for easy self-assembly.
Alternatively, we can deliver locally and provide an erection service at an additional cost. (Local delivery is within a 30 mile radius of our workshop and exact cost will depend on distance, and the work/time involved. Please ask us for a quote if you require this service)
PRICES
Due to the current climate, prices of materials are constantly fluctuating. Therefore we are unable to provide prices on our website for our standard partitions at present. Please contact us with your query and we will be able to give you an accurate, up to date quote.
BESPOKE STABLES
As well as our standard 10' and 12' stable partitions, we also offer a bespoke service. Our partitions can be made to order in a variety of sizes.
We can also help with designing a layout if you are wanting to maximise the potential of your available space.
Please do not hesitate to get in touch to discuss your specific requirements and we would be happy to provide you with a quote!



